SOUTH PASADENA, Los Angeles County — Thursday, November 12, 2026. A major transportation project is moving forward in one corridor while another part faces a pause after neighborhood feedback. City officials have scheduled a public meeting tonight from 6 to 7:30 p.m. at the South Pasadena Middle School auditorium, 1500 Fair Oaks Avenue, to discuss the Huntington Drive–Fremont Avenue Corridor Improvements Project.
What neighbors can influence
According to the city’s project page, updated October 5, the Huntington Drive portion will continue through design. Planned changes for Fremont Avenue are temporarily on hold while city staff and their consultant examine resident concerns about parking, existing right-of-way, easements and movement for people walking, biking and driving. The pause is not a permanent cancellation, and the project page says recommendations may return to the council later.
Where the project is located
Huntington Drive’s study area extends from Alhambra Road to Garfield Avenue, while Fremont Avenue’s extends from Columbia Street to Alhambra Road. Earlier designs considered bicycle facilities, sidewalk work, traffic signal changes and accessibility improvements. City council design-concept approvals in May and June were part of planning, not proof all construction has been authorized.
What happens at tonight’s meeting?
The city’s October 30 meeting announcement calls this a community update and feedback session. The local report published November 1 confirms the same location and 6–7:30 p.m. timeframe. Residents can ask whether proposed bicycle and pedestrian designs preserve essential parking access, how emergency vehicles will be accommodated and what engineering studies inform any lane reconfiguration.
Questions South Pasadena News will follow
- When will a revised Fremont Avenue proposal be released for public review?
- What specific design features were changed as a result of neighborhood comments?
- Which streets might lose or gain curbside parking, and where is a block-level plan published?
- What is the current construction budget, schedule and funding status?
- Will the city publish meeting materials and a dated response to resident feedback?
Source record: City of South Pasadena official project page; city meeting announcement. The meeting’s eventual outcome is not established at publication time. Contact the city project team at huntington-fremont@southpasadenaca.gov or share documented feedback with South Pasadena News. We will update the story when public meeting records are available.
Support South Pasadena News
Choose how to support South Pasadena News:
Credit / Debit Card via StripeChoose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.
Continue with PayPal Continue with ZelleZelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.
Optional reader support. When possible, add “South Pasadena News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.More from South Pasadena News
- South Pasadena city council District 4: Michael Cacciotti Leads Nevin Stanton-Trehan by 564 Votes in Nov. 13 Count →
- South Pasadena to Restrict Parking on Seven Residential Streets as Pavement Sealing Begins →
- South Pasadena District 4: Cacciotti Leads; Measure SOS Has 79% Yes →
- South Pasadena Senior Center Plans November 10 Veterans Luncheon With Advance Reservations →
- South Pasadena Library’s Cover to Cover Reading Program Runs Through November 14 →
COMMUNITY
Comments
Join the California58 conversation. You must be signed in to comment.
Create a free California58 account or sign in with an available social provider.